Skip to content
Droid/Warehouse robot evidence record

Pickle Unload Robot

Inspect the package envelope, named KUKA arm and downstream AmbiStack relationship without mistaking an announced integration for a measured site result.

Current Unload Robot / Dill overview; exact arm and robot revisions unknown

What does the published package envelope leave unresolved?

Pickle supplies weight and dimensional bounds. These help screen a sample carton, but do not establish grip success, allowed orientation, exception workload or the throughput of the complete receiving line.

Pickle Robot ↗

Published conditions and unresolved fields

These are supplier statements, not independently measured performance. The selected configuration and full trial conditions determine applicability.

Original quantities stay attached to their evidence and limits.
FieldPublished valueConditions
Maximum package weight50 lbLoose-packed, floor-loaded freight; confirm packaging and load condition.
Pickle Robot ↗
Published package bounds6 × 6 × 6 in to 24 × 24 × 32 inOur dimensional check permits axis permutation only as a preliminary geometric test; handling orientation still needs approval.
Pickle Robot ↗
Reported unloading rate400–1,500 packages/hourSupplier says freight-dependent production performance; no shared independent benchmark.
Pickle Robot ↗
Named arm supplierSix-axis KUKA armExact model and part number are not disclosed.
Pickle Robot ↗
Autonomy softwareDill Autonomy EngineSupplier describes classical control, generative AI and targeted human input.
Pickle Robot ↗
Temperature envelopeNot established in reviewed sourcesNo rated operating interval established in these reviewed pages.
Evidence status: unknown
Configured priceNot established in reviewed sourcesNo current quote or complete service scope established.
Evidence status: unknown

Implications for the receiving workflow

Droid’s analysis and proposed checks:

  1. A named arm supplier is a useful relationship, not a parts list. Obtain the model, mounting, tool and controller revision before planning spare parts or substitution.
  2. Do not read a dock-level installation claim as a guarantee for the whole warehouse. Define where identity capture, sorting and inventory updates occur.
  3. Price human assistance by trigger, response time and responsibility. A general autonomy label cannot determine the labor remaining on a specific receiving shift.

Documented components and connected systems

Included components and downstream systems are labeled separately. These relationships are not a complete bill of materials or proof of replaceability.

documented included component

KUKA six-axis arm in Pickle

Model and revision unspecified; do not infer a KR-series part

Pickle Robot ↗
documented software

Dill Autonomy Engine

Undated current overview; software release unspecified

Pickle Robot ↗

Dated evidence to inspect

Keep announced plans separate from installed operations, and keep a reported integration separate from measured shift results.

Still to establish

  • Exact KUKA model, gripper and control interfaces
  • Approved carton materials and orientations
  • Temperature limits and representative shift results
  • Named customer/site and acceptance results for the AmbiStack integration

What the pilot must prove

  1. Assess the full freight distribution, not one convenient carton.
  2. Record interventions and recovery time by cause.
  3. Verify conveyor, scan and pallet handoffs under a stopped downstream condition.
  4. Request a dated, configured equipment and support quote.

Source record

  1. Truck unloading requirements ↗Pickle Robot · Undated page; exact robot revision unspecified · Checked 2026-11-10
  2. Pickle Unload Robot and Dill Autonomy Engine ↗Pickle Robot · Undated current system overview · Checked 2026-11-10
  3. Pickle Robot and AmbiStack integration announcement ↗Pickle Robot / Ambi Robotics · June 30, 2026 as printed; customer site, duration and measured throughput not disclosed · Checked 2026-11-10
START WITH THE WORKFLOW

Bring us the task.
Let’s find the fit.

Share your environment, the job to be done, and the outcome you need to measure.

Request a project review