What does usable
robot data cost?
Estimate robot data collection cost per accepted demonstration. Include calibration, failed attempts, review labor, equipment and integration, then vary acceptance rate.
DROID RESEARCH · SOURCES CHECKED
Budget the accepted demonstration.
Recording time is only one cost. This calculator includes every attempted demonstration in review labor, even when the resulting data is rejected. Inputs are illustrative assumptions—not market prices, quotes or measured product results. Calculations stay in your browser.
Illustrative campaign estimate. Replace every default with your measured or quoted inputs.
- Attempted
- 3,200
- Expected accepted
- 2,560
- Capture, setup & review labor
- 282.7 hours
- Labor cost
- $9,893.33
- Equipment, integration & other
- $9,000.00
- Total campaign cost
- $18,893.33
If acceptance changes
Same attempts and costs; acceptance moves by 10 percentage points, bounded at 0–100%.
| Accepted | USD / accepted demo |
|---|---|
| 70% | $8.43 |
| 80% | $7.38 |
| 90% | $6.56 |
The calculation is open.
Expected accepted demonstrations may be fractional in a planning scenario. At zero accepted demonstrations, unit cost is undefined. The tool does not assume rejected demonstrations can be fixed for free.
Use a measured throughput.
Enter attempts per paid capture hour after resets, object changes and interruptions. If your capture rate already includes calibration time, avoid adding those same hours again. For teams with different pay rates, use an equivalent blended rate or run separate scenarios.
Allocate only the equipment cost attributable to the campaign. Do not charge the full purchase price again for every dataset unless that is your intended accounting assumption.
Define acceptance first.
Write down the task, synchronization tolerance, completeness checks and outcome labels that make an episode usable. A high acceptance rate has no meaning if the criteria change between tools or operators.
This estimate excludes costs you have not entered. Add storage, annotation, compute and maintenance to the relevant fields. It estimates data acquisition cost, not model performance or robot ROI.
Bring us the task.
Let’s find the fit.
Share your environment, the job to be done, and the outcome you need to measure.