Stretch sensing gripper
2025 brochure; replacement part number not specified
Boston Dynamics ↗Separate Stretch’s unloading envelope from its newer case-picking workflow, and distinguish a customer-reported rate from a fleet expansion plan.
DROID RESEARCH · SOURCES CHECKED
No. Boston Dynamics now describes case picking with Orbit-based WMS integration. Confirm the quoted configuration and release; the 2025 unloading brochure is not a specification for every current workflow.
Boston Dynamics ↗Boston Dynamics ↗These are supplier statements, not independently measured performance. The selected configuration and full trial conditions determine applicability.
| Field | Published value | Conditions |
|---|---|---|
| Maximum case weight | 50 lb / 23 kg | Manufacturer’s rounded unit pair; case weight, not pallet payload. Boston Dynamics ↗ |
| Operating temperature | 41–113 °F / 5–45 °C | 2025 unloading brochure; validate the delivered configuration and dock extremes. Boston Dynamics ↗ |
| Brochure unloading rate | 600–800 cases/hour | Supplier range; freight mix and full-shift denominator not specified. Boston Dynamics ↗ |
| Current case-picking application | Case handling and palletized order building | The application page describes WMS connection through Orbit; installed release remains to confirm. Boston Dynamics ↗ |
| Automated dimensional verdict | Not established in reviewed sources | The brochure’s surface-length wording is not treated as an axis-by-axis acceptance rule in our screener. Evidence status: unknown |
| Configured price | Not established in reviewed sources | No dated, scoped current quote established. Include conveyor and integration responsibilities. Evidence status: unknown |
Droid’s analysis and proposed checks:
Included components and downstream systems are labeled separately. These relationships are not a complete bill of materials or proof of replaceability.
2025 brochure; replacement part number not specified
Boston Dynamics ↗Keep announced plans separate from installed operations, and keep a reported integration separate from measured shift results.
Share your environment, the job to be done, and the outcome you need to measure.